tayco Hanna Series Installation Manual page 20

Table of Contents

Advertisement

Hanna squircle table with tubular "X" base
2. Position the tubular "X" base
using the pre-drilled positioning
holes and attach it to squircle
table top using #10 X 1" Oval
Head Screws, (Figure 2).
3. Drive four more screws to squircle
table top using #10 X 1" Oval
Head Screws, (Figure 3).
4. Lift the table into an upright
position; level and adjust the
glides if necessary.
FEBRUARY 2020
Drill
Robertson # 2
Tools & Hardware Needed
8540-0789
#10 X 1" Oval Head
Screw (8X)
Figure 2
Figure 3
hanna 17

Advertisement

Table of Contents
loading

Table of Contents