................................44 Electrics & Communication 45/49 wire management trough to surface ..............................45 power pole installation ......................................46 trough mounted communication box installation ........................48 trough mounted power box installation .............................. 49 2 Scene MARCH 2016...
1. Labeled furniture plans for installation purposes are located in the hardware box. Ensure that drawings are complete and handy before beginning installation. Waste Management 1. Establish a trash removal area separate from the product staging area. 3 Scene MARCH 2016...
Painted Metals Tayco's painted metal products are powder-paint-coated. To clean these products, use a damp cloth, using only a small amount of lukewarm water if necessary. Dry with a clean, dry cloth. To avoid scratching and damaging the painted surface, do not use hard bristled brushes or abrasives.
SHARED (2 SURFACES) post post shared post IMPORTANT NOTES: shared Do not drill all the pre-drilled holes, drill only where required as per furniture layout configuration. Check the layout for post positioning. Pre-drilled holes Figure 2 Grommet hole 5 Scene MARCH 2016...
Page 6
4 shared surfaces. post post shared Pre-drilled holes Figure 3 Grommet hole IMPORTANT NOTES: Do not drill all the pre-drilled holes, drill only where required as per furniture layout configuration. Check the layout for post positioning. 6 Scene MARCH 2016...
END TO END, Figure 1 Post Privacy Screens Worksurface Figure 1 7 Scene MARCH 2016...
Page 8
(cont'd) END TO SHARED, Figure 2 Post Privacy Screens Worksurface WORKSURFACE 66" & BELOW WORKSURFACE OVER 66" Figure 2 8 Scene MARCH 2016...
Page 9
(cont'd) SHARED TO SHARED, Figure 1 Post Privacy Screens Worksurface WORKSURFACE 66" & BELOW WORKSURFACE OVER 66" Figure 1 9 Scene MARCH 2016...
Page 10
(cont'd) ACRYLIC SCREEN Screen extrusion Acrylic Screen gasket Post cap Post Figure 1 TACKBOARD/FELT/WHITEBOARD/ MELAMINE SCREEN Screen extrusion Tackboard/Felt/Whiteboard/ Melamine screen Screen gasket Post cap Post Figure 2 10 Scene MARCH 2016...
Page 11
(cont'd) ACCESSORY SCREEN Accessory screen Post Post cap Figure 3 11 Scene MARCH 2016...
STEP 1 The following application guidelines provide detailed instructions for planning with the Scene product line. Position all the storages (Towers, cabinets, lateral files and cabinets). Assemble all worksurface supports (gables and reinforcement bars). STEP 2 12 Scene...
Page 13
(cont'd) STEP 3 Install the posts to the surfaces. Position all worksurfaces. Mount them to the worksurface supports or credenza. Install the screens. STEP 4 13 Scene MARCH 2016...
Page 14
Install the single support post and low credenza support to low credenza support worksurfaces. Position the worksurfaces and mount it to worksurface or credenza. Position all spacers and mount them to credenza. single support post STEP 6 spacers 14 Scene MARCH 2016...
Page 15
(cont'd) STEP 7 Install the flag support to flag flag storage storage. Position the flag storage and mount them to the surface. Position and mount the mounted storages. flag support STEP 8 mounted storage 15 Scene MARCH 2016...
Page 16
(cont'd) STEP 9 Install the surface mounted screen, trough and trough mounted modesty. 10. Install task lights, cable management, trough mounted receptacle and data. Mount the accessories to accessory rails. STEP 10 16 Scene MARCH 2016...
Check the layout for post positioning. FIGURE 2 tools & hardware needed measuring torpedo level drill # 2 Robertson 5 mm V-point #8 x 2" Washer tape long bit drill bit head screw 17 Scene MARCH 2016...
(Figure 1). Slide the bottom screen extrusion down the screen post, (Figure 2). For felt screen installation, see "felt screen to screen post". FIGURE 1 FIGURE 2 tools & hardware needed measuring tape 18 Scene MARCH 2016...
Page 19
(Figure 3). Slide the gasket down the screen post until it bottoms out. Slide the screen into the gaskets within the posts, (Figure 4). FIGURE 3 FIGURE 4 tools & hardware needed measuring tape 19 Scene MARCH 2016...
Page 20
Place the top screen extrusion on top of the screen. Repeat steps 3 to 5 until all screens are in position except accessory screen shown in (Figure 5). FIGURE 5 FIGURE 6 tools & hardware needed measuring tape 20 Scene MARCH 2016...
Page 21
(cont'd) Place the post top caps and fillers as shown in top cap (Figure 7). fillers FIGURE 7 tools & hardware needed measuring tape 21 Scene MARCH 2016...
Slide the bottom extrusion sideways, (Figure 1). Slide the appropriate screen gasket down the felt screen, (Figure 2). FIGURE 1 FIGURE 2 tools & hardware needed measuring tape 22 Scene MARCH 2016...
Page 23
Insert the screen down the screen post until it bottoms out, (Figure 3). Place the top screen extrusion on top of the screen, (Figure 4). FIGURE 3 FIGURE 4 tools & hardware needed measuring tape 23 Scene MARCH 2016...
Page 24
Place the post top caps and fillers as shown in Figure 5. FIGURE 5 tools & hardware needed measuring tape 24 Scene MARCH 2016...
Figure 2 NOTES: tools & hardware needed > Bottom screws should be tightened first, then the top screws. #2 robertson 1/4 #20;1" quadrex drill long bit pan head screw 25 Scene MARCH 2016...
Figure 2 NOTES: tools & hardware needed > Bottom screws should be tightened first, then the top screws. #2 robertson 1/4 #20;1" quadrex drill long bit pan head screw 26 Scene MARCH 2016...
Attach the no connector reinforcement bars tothe worksurface with #10; 1-inch oval head screws (Figure 2). 3 1/16-inches Figure 2 tools & hardware needed measuring #2 Robertson #10 1" oval drill tape long bit head screw 27 Scene MARCH 2016...
Figure 1 With the worksurface assembled; secure the worksurface to the reinforcement beams with #10; 1-inch oval head screws, (Figure 1). tools & hardware needed #2 Robertson #10 1" oval head screw drill long bit 28 Scene MARCH 2016...
(Figure 1; short beam shown). Attach the the flag storage support with reinforcement to the bottom of the flag storage with # 10; 1-inch oval head screws, (Figure 2). Figure 2 29 Scene MARCH 2016...
Page 30
1-1/2 inch flat head screws through the mounting holes provided. Figure 3 shows a flag worksurface on one side. Figure 3 tools & hardware needed #2 Robertson #10 1" oval 1 1/2" flat head screw drill long bit head screw 30 Scene MARCH 2016...
1; D-top shown). Secure the single post support 11-1/4 inches with #10; 1-inch oval head screws, (Figure 2). Figure 2 tools & hardware needed measuring #2 Robertson #10 1" oval head screw drill tape long bit 31 Scene MARCH 2016...
Figure 1 Position the worksurfaces on top of the assembled supports, (Figure 1). Secure the worksurfaces together with flush plates and #10; 1-inch oval head screws (Figure 2). Figure 2 32 Scene MARCH 2016...
Page 33
Move the worksurface to one side and secure the remaining worksurfaces with flush plates and #10; 1-inch oval head screws, (Figure 3). tools & hardware needed #2 Robertson #10 1" oval drill long bit head screw 33 Scene MARCH 2016...
#10; 1-inch oval head screws (Figure 2). Align the credenza to the 7-1/16 inches worksurface. 5-3/8 inches Figure 2 CREDENZA TOP CENTERLINE tools & hardware needed #2 Robertson #10 1" oval head screw drill long bit 34 Scene MARCH 2016...
Mount the worksurface above the credenza and secure the reinforcement beams to the surface (Figure 2). 7-1/16 inches Figure 2 CREDENZA TOP CENTERLINE tools & hardware needed #2 Robertson #10 1" oval head screw drill long bit 35 Scene MARCH 2016...
(Figure 1). From the inside of the credenza, drill through the top following the corresponding drilling points to match the required worksurface spacer, (Figure 2). Figure 1 Figure 2 DRILL POINTS 36 Scene MARCH 2016...
Page 37
Secure the inset spacer to the credenza with #10-24; 1-1/4 inch machine screws, (Figure 4). 2 1/2" FRONT Figure 3 Figure 4 tools & hardware needed #2 Robertson #10-24; 1 1/4" drill #3 drill bit long bit machine screw 37 Scene MARCH 2016...
Secure the worksurface to the high credenza with #10-24; 1-1/4 inch machine screws, (Figure 2). DRILL POINTS Figure 2 tools & hardware needed #2 Robertson #10-24; 1 1/4" drill #3 drill bit long bit machine screw 38 Scene MARCH 2016...
Page 41
8 screws for hutches with dividers (60-inches, 66-inches and 72-inches wide). > make sure no electrical wires are measuring #2 Robertson #10-3" drill tape torpedo level stud finder long bit wood screw on the way of the screws. 41 Scene MARCH 2016...
1/4-20 round head screws with three washers on each screw (Figure 1). FIGURE 1 tools & hardware needed measuring drill # 2 Robertson 1/4-20 Round tape long bit washers (3) machine screw 44 Scene MARCH 2016...
Use #10 1" oval head screws to attach the wire management trough to the underside of the reinforcement bar, (Figure 2). FIGURE 1 FIGURE 2 tools & hardware needed measuring drill # 2 Robertson # 10x 1" tape long bit pan screws 45 Scene MARCH 2016...
Attach half of the power pole to the bracket using #10-32 machine screws. FIGURE 1 FIGURE 2 tools & hardware needed #10 x 5/8" pan # 10- 32 measuring drill # 2 Robertson self drilling machine screws tape long bit screws 46 Scene MARCH 2016...
Page 47
5. Place the ceiling collar around the management column and mount to the cieling with 6 screws; (Figure 4). FIGURE 3 FIGURE 4 tools & hardware needed #2 Robertson #10 11/16" oval head screw drill long bit 47 Scene MARCH 2016...
& hardware needed come with any data cables. > The trough mounted communication box is equipped #2 Robertson 2, #6; 3/8"sheet with one RJ11, RJ45 and a metal screw drill long bit spare opening. 48 Scene MARCH 2016...
FIGURE 1 metal screws, (Figure 2). FIGURE 2 tools & hardware needed NOTES: > The trough mounted power box #2 Robertson 2, #6; 5/8" sheet does not come with any electrical metal screw drill long bit harnesses. 49 Scene MARCH 2016...
Need help?
Do you have a question about the Scene and is the answer not in the manual?
Questions and answers