Page 3
General Instructions installation checklist..............................1 care and maintenance ..............................2 screen definition ................................4 screen elevations ................................. 6 installation sequence ..............................7 Screens 10|39 beams and screens installation – modesty height 24-inches ..................10 beams and screens installation – worksurface division height 37-inches ..............12 beams and screens installation –...
Page 4
Mounted Storage 70|74 top mounted shared shelf installation ......................... 70 post mounted overhead cabinet installation ....................... 71 beam mounted shelf installation ..........................73 Electrics, Communications, Lighting 75|89 horizontal wire management trough installation to beam .................... 75 floor to worksurface vertical wire manager installation to post ..................76 ceiling feed vertical wire management installation .....................
Page 5
1. Labeled furniture plans for installation purposes are located in the hardware box. Ensure that drawings are complete and handy before beginning installation. Waste Management 1. Establish a trash removal area separate from the product staging area. DECEMBER 2008 up 1...
Page 6
Rinse with clean water and dry by blotting with a damp cloth or chamois. Edge Trim To remove minor scuffmarks and general dirt from bases and connectors, use warm water and a soft cloth. Do not use harsh abrasive cleaners, as they may cause permanent scratches on the surface. DECEMBER 2008 up 2...
Page 7
Painted Metals Tayco’s painted metal products are powder paint coated. To clean these products, use a damp cloth, using only a small amount of lukewarm water if necessary. Dry with a clean, dry cloth. To avoid scratching and damaging the painted surface, do not use hard bristled brushes or abrasives.
Page 48
worksurface support metal flush gable installation FIGURE 1 The metal flush gable is used to support worksurfaces from the support post in either a left, right or shared position. 1. Remove the top cap from the support posts, (Figure 1). 2.
Page 49
worksurface support metal flush gable installation (cont'd) 4. Adjust the metal flush gable to 26 INCHES 27 INCHES the desired height, and affix the 28 INCHES screws to lock the plate in place, 29 INCHES 30 INCHES (Figure 5). 31 INCHES 32 INCHES 5.
Need help?
Do you have a question about the Up and is the answer not in the manual?
Questions and answers