Sanitizing Procedure - Following Cleaning Procedure - Hoshizaki KMS-1230MLH Service Manual

Modular crescent cuber serenity series
Hide thumbs Also See for KMS-1230MLH:
Table of Contents

Advertisement

9) Remove the insulation panel by removing the thumbscrews, then pour the cleaning
solution into the water tank.
10) Move the service switch to the "WASH" position.
11) Replace the insulation panel and the front panel in their correct positions.
1) Turn on the power supply and start the washing process.
13) Turn off the power supply after 30 minutes. Remove the front panel.
14) Move the service switch to the "DRAIN" position.
15) Replace the front panel and turn on the power supply for  minutes.
16) Turn off the power supply and remove the front panel.
17) Move the control switch to the "ICE" position.
18) Replace the front panel in its correct position.
19) Turn on the power supply to fill the water tank with water.
0) Turn off the power supply after 3 minutes.
1) Remove the front panel.
) Move the control switch to the "SERVICE" position, then move the service switch to the
"WASH" position.
3) Replace the front panel in its correct position.
4) Turn on the power supply to rinse off the cleaning solution.
5) Turn off the power supply after 5 minutes.
6) Remove the front panel.
7) Move the service switch to the "DRAIN" position.
8) Replace the front panel and turn on the power supply for  minutes.
9) Turn off the power supply. Remove the front panel.
30) Repeat the above steps 17) through 9) three more times to rinse thoroughly.
Note: If you do not sanitize the icemaker, go to step 13 in ". Sanitizing Procedure."

2. Sanitizing Procedure - Following Cleaning Procedure

1) Dilute a 5.5% sodium hypochlorite solution (chlorine bleach) with water. (Add  fl. oz.
(60 ml) of sanitizer to 4 gal. (15 l) of water).
) Remove the insulation panel, if it is in its normal position.
3) Pour the sanitizing solution into the water tank.
4) Move the service switch to the "WASH" position.
5) Replace the insulation panel and the front panel in their correct positions.
6) Turn on the power supply, and start the sanitizing process.
7) Turn off the power supply after 15 minutes. Remove the front panel.
8) Move the service switch to the "DRAIN" position.
9) Replace the front panel and turn on the power supply for  minutes.
50

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk-13hSrk-13h3

Table of Contents