Install Your Switch
Figure 38: Inserting the DC terminal connector into the slot on the power supply
7. Connect the power cables to the DC source voltage, using hardware appropriate to the installation
site and following local and national electrical codes.
8. Energize the circuit. When power is connected, verify that the PWR LED is green.
When the PWR LED has turned green, follow the instructions in
64.
If the PWR LED does not turn green, refer to
information.
5320 Series Switch LEDs
ExtremeSwitching 5320 Series Hardware Installation Guide
Connect DC Power
Activate and Verify the Switch
on page 69 for troubleshooting
on page
63
Need help?
Do you have a question about the ExtremeSwitching 5320 Series and is the answer not in the manual?
Questions and answers