Safety Instructions; Installation Instructions - PARRY CPC Product Instructions

Pie cabinet
Hide thumbs Also See for CPC:
Table of Contents

Advertisement

Safety Instructions

This appliance has been designed to warm products and therefore during its use parts of the
appliance will become very hot. All personnel must be given appropriate supervision and
training in the safe use of this appliance.
All appliances other than those supplied with a sealed moulded plug must be fitted with
a sealed moulded plug by a qualified electrician, in accordance with current regulations.
The unit should be installed in compliance with the Installation Instructions and the
National regulations in force at the time. Particular attention should be paid to the
Health and Safety at Work Act.
To prevent shocks, all appliances whether gas or electric, must be earthed.
To avoid scratching of the unit, the protective film on the exterior surfaces has NOT
been removed, this is to protect the highly polished exterior whilst in transit.
It is IMPORTANT that this protective film is peeled off before the equipment is used.
Ensure that vents intended to provide air flow in and around the unit are not obstructed.
Ensure the appliance is isolated from the power supply before installing, cleaning or
maintaining the appliance

Installation Instructions

It is important that all protective film is removed from the unit and all packaging materials
disposed of before use.
Ensure the unit is positioned on a flat surface.
Carefully slide the front glass into the supports on the front of the unit.
Put the element guard in place over the element, with the cut out for the humidity
tray towards the back of the unit.
Place the humidity tray into the cut out in the element tray.
Hook the shelf supports into the cut outs on the inner sides of the unit.
Slide the wire shelves into the unit so that they rest on the shelf supports.
Take one of the doors and push it up into the inner channel at the top of the unit and
holding the door vertical drop into the channel at the bottom.
Repeat last procedure with the remaining door to fill the outer channel. The doors
should freely slide from left to right.
IN105-7
Parry-British Built for Purpose
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpc1

Table of Contents