PARRY CPC Product Instructions

Pie cabinet
Hide thumbs Also See for CPC:

Advertisement

Quick Links

Instruction Manual
Pie Cabinet
CPC/CPC1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CPC and is the answer not in the manual?

Questions and answers

Summary of Contents for PARRY CPC

  • Page 1 Instruction Manual Pie Cabinet CPC/CPC1...
  • Page 3: Table Of Contents

    Wiring Diagram ........................... 8 Exploded View ..........................9 Parts List ........................... 10 Warranty Information ........................ 11 Disposal & Recycling ......................... 12 Parry Catering Equipment (Midlands) Ltd, Town End Road, Draycott, Derby, DE72 3PT. Sales Tel: 01332 875544 Parry-British Built for Purpose IN105-7...
  • Page 4: Product Overview

    Constructed with a robust stainless steel frame for reliable storage space and easy cleaning, this Parry Modular Heated Pie Cabinet can accommodate up to 60 freshly baked pies hygienically without losing the customer’s view of the product. Any of the two/three wired shelves can be removed for cleaning and to fit larger stock, with all interior content being accessed through rear sliding doors at any time during service.
  • Page 5 CPC1 Unpacked weight (kg) Packet weight (kg) Dimensions (w x d x h) mm 750 x 360 x 455 750 x 360 x 545 Warranty 2 Years 2 Years Overall power rating 750W 750W Plug Parry-British Built for Purpose IN105-7...
  • Page 6: Safety Instructions

    Take one of the doors and push it up into the inner channel at the top of the unit and holding the door vertical drop into the channel at the bottom. Repeat last procedure with the remaining door to fill the outer channel. The doors should freely slide from left to right. Parry-British Built for Purpose IN105-7...
  • Page 7: Operating Instructions

    Ensure the door is kept closed between each serving to keep heat loss to a minimum. Wipe down regularly with soapy water after switching off and disconnecting from the power supply. Parry-British Built for Purpose IN105-7...
  • Page 8: Cleaning Instructions

    Maintenance and service must only be undertaken by a qualified electrician. Parry Catering provides a complete after-sales service by offering the sales of spare parts directly to customers. Buying spares straight from the manufacturer allows customer to experience exceptional value and speedy delivery on all spare parts.
  • Page 9: Fault Finding

    This appliance should be routinely serviced to prolong its lifetime. Parry recommends that the appliance is serviced every 12 months by a Parry authorised engineer. Failure to service your product within the initial 12-month warranty period will cause the 24-month warranty to become void.
  • Page 10: Wiring Diagram

    Wiring Diagram Parry-British Built for Purpose IN105-7...
  • Page 11: Exploded View

    Exploded View Parry-British Built for Purpose IN105-7...
  • Page 12: Parts List

    BULB LAMP0015W BULB COVER LAMP0015W *FRONT GLASS SUPPORTS (LEFT AND RIGHT) INNER BODY FRONT GLASS CPC PLGL00349 PLGL00447 *OUTER LEFT PANEL CPC HUMIDITY TRAY AS3481TRY *MIDDLE DOOR RAIL *SMALL DOOR RAIL *LARGE DOOR RAIL *ELEMENT COVER *BODY *BASE *Metalwork Components...
  • Page 13: Warranty Information

    Parry and not the sale or installation date of the equipment. Please ensure you have referred to the manufacturer’s instruction before placing a warranty...
  • Page 14: Disposal & Recycling

    Parry Catering recognises our obligations to the EU DIRECTIVE covering the waste disposal of electrical and electronic equipment (WEEE). Parry Catering are committed to this policy in order to help conserve the environment.

This manual is also suitable for:

Cpc1

Table of Contents