One temperature logger triggered at the time of dispatch from the factory /CS Material
Logistics,
One temperature logger to be triggered by the CSE when returning the uninstalled de-
tector according to the CS spare parts return procedure (to activate the logger, press
the button marked PUSH TO START on the short side of the logger for about 10 sec.
Activation will be confirmed by a brief, simultaneous flash of the green and red LEDs).
The detectors are serialized IVKs and are subject to product tracking regulations. The
replacement should be documented with entries in the LINA / P42 product tracking tool,
indicating the serial number of both the old and new detectors. The removed detector, its
CD-ROM, and an activated temperature logger must be returned immediately in accor-
dance with the return process. Be sure to include the temperature logger from the old
detector.
Warranty agreements between Siemens Medical Solutions and the original equipment
manufacturer stipulate that the temperature loggers that monitor temperature during
transport and storage be activated not only when the new detector is shipped, but also
when the old detector is returned, even though it is presumed faulty. In addition, the
detector must always be accompanied by the CD-ROM with the detector-specific files.

Documents required

As mentioned above, two versions of the MAMMOMAT Novation
to the customers worldwide.
The replacement procedure requires all the technical documents originally delivered with
the unit and/or supplied with later updates/upgrades. These include, in particular:
Installation Instructions and Start-Up (DROC), SPB7-250.812.01...
System Startup with WH AWS, SPB7-250.815.01...
In addition to the technical documentation, the
Instructions for Use and the
Quality Control manual are needed.

Tools and test equipment required

The CSE standard toolbox
The phantoms and the test equipment listed in the specific tests of the relevant QC
manual and installation instructions or startup manual, depending on the kind of work-
station installed.

Procedures and work steps

Preparatory tasks, unpack and check replacement detector
The CSE must be familiar with:
MAMMOMAT Novation DR
Replacing basic unit components
SPB7-250.841.01.04.02
05.05
DR
have been delivered
Page 10 of 64