Basic Operations Using the DIP Switch
4-2
Basic Operations Using the DIP Switch
4-2-1
STEP 1: Starting
Procedure
1,2,3...
!Caution
Note The buzzer on the Scanner may sound or the OK indicator or illu-
4-2-2
STEP 2: Setting Reading Conditions
TRIG
24VDC
1
O
PWR
2
N
3
RUN
4
ERR
5
6
SCANNER
MONITOR
CONSOLE
RS-232C
V530-C300
2D CODE READER
DIP Switch Settings
1.
Be sure that the basic V530-C300E components have been con-
nected correctly. page 10
2.
Turn ON the power supply to the V530-C300E.
The RUN indicator will light.
Do not turn OFF the power supply for 30 seconds after turning
ON the power supply. Data in memory may be destroyed, possi-
bly preventing correct operation in the future.
mination may light for 30 seconds after power is turned back ON,
but this does not indicate a malfunction.
The DIP switch on the Controller is set according to the code being
read.
1
2
3
4
5
6
SW1
Teaching enabled.
ON
Teaching disabled.
OFF
SW1: Turn ON to perform
SW1
O
SW2: Switches the code between
N
SW2
SW3 to SW6:
SW3
SW4
SW5
SW6
Section 4-2
teaching.
QR and data matrix.
Set specifics for the code
being read.
QR Code:
SW3 sets the symbol color.
(SW4 to SW6 are not used.)
Data Matrix:
Set the matrix size.
31