Installation Of The Connection Pipe - McQuay MQS-174018-CFC216A Installation And Operation Manual

Dc inverter floor ceiling type unit
Table of Contents

Advertisement

DC Inverter U-match Series Floor Ceiling Type Unit
(3). Installation Method: Insert the pipe joint into the hole φ25 located at the base
plate of the unit and then connect the drain pipe to the pipe joint.

5.3 Installation of the Connection Pipe

5.3.1 Flare Processing
(1). Cut the connection pipe with the pipe cutter and remove the burrs.
(2). Hold the pipe downward to prevent cuttings from entering the pipe.
(3). Remove the flare nuts at the stop valve of the outdoor unit and inside the
accessory bag of the indoor unit, then insert them to the connection pipe, after
that, flare the connection pipe with a flaring tool.
(4). Check if the flare part is spread evenly and there are no cracks (see Fig. 4.8).
5.3.2 Bending Pipes
(1). The pipes are shaped by your hands. Be careful not to collapse them.
(2). Do not bend the pipes in an angle more than 90°.
Fig. 4.7
Fig. 4.8
Fig. 4.9
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents