Download Print this page

Mercia Garden Products 03DTSHRA1008FGC42TW-V1 General Instructions Manual

Dip treated shiplap reverse apex 10x8 fully glazed concertina 4, 2 tall windows- summer house

Advertisement

Quick Links

General Instructions
03DTSHRA1008FGC42TW-V1
DIP TREATED SHIPLAP REVERSE APEX 10X8 FULLY GLAZED CONCERTINA
4, 2 TALL WINDOWS- SUMMER HOUSE
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING
A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance,
annual treatment and to allow air ow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing
damage to the building.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-
ment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above
the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
length
measuring tape.
head
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 03DTSHRA1008FGC42TW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 03DTSHRA1008FGC42TW-V1

  • Page 1 For assistance please contact customer care on: 01636 821215 TYPES OF BASE Mercia Garden Products Limited, - Concrete 75mm laid on top of 75mm hard-core. Sutton On Trent, - Slabs laid on 50mm of sharp sand.
  • Page 2 03DTSHRA1008FGC42TW-V1 Please retain product label and instructions for future reference Overall Dimensions: Width = 3010mm Depth = 2489mm Height = 2670mm Base Dimensions: Width = 2912mm Depth = 2350mm Before assembly please make sure you have a Roof QTY 2...
  • Page 3 Please retain product label and instructions for future reference Step 2 Nail Bag Parts needed - No. 10 QTY 1 There may be extra screws present in the nail bag No. 11 QTY 1 No. 25 QTY 8 External 35mm Bolt QTY 4 30mm Screw QTY 121 Turn the door panel (No.1) over so the 60mm Screw QTY 28...
  • Page 4 Please retain product label and instructions for future reference Step 4 Step 6 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 1 QTY 1 Parts Needed - No.7 QTY 1 No. 2 QTY 2 - No.22 QTY 4 Fix the Plain Panel (No.2) and Secure the oor (No.
  • Page 5 Please retain product label and instructions for future reference Step 10 Step 8 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No.2 QTY 2 Place the assembled oor panels - No.3 QTY 1 (No.7) upside down onto a rm and - No.4 QTY 1 level base.
  • Page 6 Please retain product label and instructions for future reference Step 12 Step 14 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No.4 QTY 1 Parts Needed - No.14 QTY 4 - No.3 QTY 1 Place the panel framing (No.14) Fix the corners of the side along the top of the panel at the (No.4 and No.3) and the...
  • Page 7 Please retain product label and instructions for future reference Step 16 Step 18 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No.19 QTY 2 Align the ridge bar (No.12) Fix the roof support blocks (No.19) to between the gables and secure to the back and door panel upright fram- the central uprights with 2x30mm...
  • Page 8 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 21 Step 20 IMPORTANT: Pre-drill before xing screws. Parts needed - No 8 QTY 2 Parts Needed - No.15 QTY 4 - No. 9 QTY 2 - No.16 QTY 2 Place the Roof Panels (No.
  • Page 9 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 22 Step 23 IMPORTANT: Pre-drill before xing screws. Parts Needed - No.31 QTY 2 Before fully xing the roof, check by eye Fix the roof framing together to see that the walls are straight by using the “U”...
  • Page 10 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 25 Step 26 Parts Needed - No.32 QTY 1 Parts Needed - No.17 QTY 11 Attach the cover trims (No.17) Cut the felt (No.32) into 3 strips of to each corner of the building 3100mm length and place onto and across each joint between...
  • Page 11 Please retain product label and instructions for future reference Step 27 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 29 Parts Needed - No.18 QTY 4 Drill 3x6mm holes into the - No.24 QTY 2 framing in line with the barrell Fix the fascias (No.18) and bolts, these will act as the catch nials (No.24) to the sides of...
  • Page 12: After Treatment

    Please retain product label and instructions for future reference Step 31 IMPORTANT: Pre-drill before xing screws. Parts Needed - No.26 QTY 2 Attach the two turn buttons (No.26) to the It is ESSENTIAL that you apply wood secondary door at the top and bottom using treatment immediately after the building 2x30mm screws.