Download Print this page

Mercia Garden Products 03DTSHCV0808HGD4MW-V1 Instructions Manual

Dip treated shiplap curved 8ft x 8ft half glazed double 4 medium window

Advertisement

Quick Links

x2
DIP TREATED SHIPLAP CURVED 8FT X 8FT HALF GLAZED DOUBLE 4 MEDIUM WINDOW
2mm Drill bit

Advertisement

loading
Need help?

Need help?

Do you have a question about the 03DTSHCV0808HGD4MW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 03DTSHCV0808HGD4MW-V1

  • Page 1 DIP TREATED SHIPLAP CURVED 8FT X 8FT HALF GLAZED DOUBLE 4 MEDIUM WINDOW 2mm Drill bit...
  • Page 3 Before assembly Roof Block - 28x28x140mm QTY 6 please make sure you have a FS2828-G-160mm (angled) suitable base ready to erect your building Door Rain Guard - 28x44x1210mm QTY 1 Mortice Lock RG2844-1210mm PI-07-0017 Side Window Rain Guard - 28x44x540mm QTY 2 RG2844-540mm MADE IN GREAT BRITAIN Front Window Rain Guard - 28x44x498mm QTY 2...
  • Page 4: Pre-Assembly

    Nail Bag Step 1 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 1 QTY 1 There may be extra screws present in the nail bag - No. 10 QTY 1 - No. 11 QTY 1 80mm Screw x 12 30mm Screw x 195 - No.
  • Page 5 Step 2 IMPORTANT: Pre-drill before xing screws. Step 3 IMPORTANT: Pre-drill before xing screws. Parts Needed - No.16 QTY 2 Parts Needed - No. 8 QTY 2 - No.23 QTY 1 - No. 24 QTY 8 - No.30 QTY 2 Secure the oor (No.
  • Page 6 Step 5 Step 7 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 5 QTY 1 Place the assembled oor panels (No.8) on to a rm and level base. Place Side Panel (No. 5) onto the oor Ensure the base has suitable drainage, next to the back panel.
  • Page 7 Step 9 Step 11 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No.1 QTY 1 Parts Needed - No. 6 QTY 1 - No. 7 QTY 1 Place the assembled door panel (No.1) onto the Place the Left Gable (No.6) and Right oor in-between the already standing Front Gable (No.7) on top of the side panels,...
  • Page 8 Step 12 Step 13 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No.12 QTY 6 Parts Needed - No. 9 QTY 3 - No.22 QTY 3 - No. 25 QTY 3 Place the three roofs (No.9) together. Place the rst Ridge Bar Please note that one of the Roof...
  • Page 9 Step 15 Step 14 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No.9 QTY 3 - No.33 QTY 2 Fix the Roof Panels to the Framing within the Panels and the Ridge Bars where they meet Place the Roof Panels (No.
  • Page 10 Step 17 Step 16 IMPORTANT: Pre-drill before xing screws. Parts Needed - No.34 QTY 1 Once the roof is xed, attach the building to the oor with 50mm Cut the felt (No.34) into 4x strips measur- screws. ing, 2580mm (L) X 1000mm (W) and lay onto the roof in the order shown in the Ensure the screws go through the illustration, leaving approximately 50mm...
  • Page 11 Step 18 IMPORTANT: Pre-drill before xing screws. Step 20 IMPORTANT: Pre-drill before xing screws. Parts Needed - No.17 QTY 8 Parts Needed - No. 19 QTY 4 - No. 20 QTY 2 Sandwich the felt either side between the roof - No.
  • Page 12 Step 21 IMPORTANT: Pre-drill before xing screws. Step 22 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 13 QTY 1 Parts Needed - No. 29 QTY 2 - No. 14 QTY 2 Fix the turn button’s (No. 29) to the top - No.
  • Page 13 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back...