Download Print this page

Advertisement

Quick Links

x2
2mm Drill bit

Advertisement

loading
Need help?

Need help?

Do you have a question about the 03DTSHCR0909GD4TW-V2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 03DTSHCR0909GD4TW-V2

  • Page 1 2mm Drill bit...
  • Page 2: Any Questions

    PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.
  • Page 3 ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
  • Page 4 Before assembly Blue Label Green Label please make sure you have a suitable base ready to erect your building Master Door QTY 1 Secondary Door QTY 1 AI-STDFGMD603X1715-V1 AI-STDFGSD603X1715-V1 MADE IN GREAT BRITAIN Overall Dimensions: Base Dimensions: Locating Block 28x28x239mm QTY 2 Width = 3164mm Width = 3033mm FS2828-239mm...
  • Page 5: Pre-Assembly

    Nail Bag Rear Panel Framing 28x28x2780mm QTY 1 FS2828-2780mm There may be extra screws present in the nail bag 30mm Screw x 71 60mm Screw x 6 Front Panel Framing 28x28x1600mm QTY 1 50mm Screw x 122 25mm Screw x 40 FS2828-1600mm 40mm Screw x 33 10mm Screw x 12...
  • Page 6 Step 1 Step 3 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No.1 QTY 1 Parts needed - No.7 QTY 2 No.11 QTY 1 No.8 QTY 1 No.12 QTY 1 No.32 QTY 6 Place oors (No.7 & No.8) on a rm and level base, ensure base has suitable Lay the Door Panel (No.1) on a at surface and place drainage free from areas where standing...
  • Page 7 Step 5 Step 7 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No.5 QTY 1 Parts needed - No. 26 QTY 1 No.6 QTY 1 No. 27 QTY 1 No.18 QTY 1 Place the Rear Panel Framing (No.26) Place the two already assembled Left on top of the Right Panels.
  • Page 8 Step 11 Step 9 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No.9 QTY 2 Parts needed - No.9 QTY 2 No.10 QTY 1 No.10 QTY 1 Place all Roof sections (No.9 & No.10) Layout the Roof Panels (No.9 & No.10) on top of the building, ensure the roof on a at level surface and position framing slots over each side equally all...
  • Page 9 Step 15 Step 13 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. *External View* Parts needed - No. 29 QTY 2 - No. 35 QTY 2 Secure the building to the oor. Fix the panels onto the oor using 50mm Fix the door handles (No.35) to the screws in alignment with the oor joists outside of the master and secondary...
  • Page 10 Step 18 **If Shed add on Pack has been purchased, IMPORTANT: Pre-drill before xing screws. Parts needed - No. 16 QTY 4 please move onto the Add on Pack Instructions** Step 17 Fit the Cover Trims (No.16) to the front of the building onto the joins of the Parts needed - No.
  • Page 11 Step 20 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 20 QTY 4 No. 21 QTY 2 No. 22 QTY 1 It is ESSENTIAL that you apply wood Fit the fascias (No.20, 21 & 22) to treatment immediately after the building the building over the felt and has been assembled.
  • Page 12 PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.