Routing Cabling; Power Supply - Viessmann KK10 Installation, Start-Up And Service Instructions Manual

Boiler control unit for high temperature heating systems
Table of Contents

Advertisement

Routing Cabling

6.

Power Supply

5.
4.
1.
3.
2.
Electrical Connections
Strain relief clamps are located in the
fittings package supplied with the
control.
1. Remove breakouts as necessary.
2. Mount lower portion of strain relief
clamp.
3. Cut rubber grommet (if applicable).
4. Insert rubber grommet in strain
relief and mount strain relief.
5. Fasten top portion of strain relief.
6. Close off openings in the control
which are not being used.
IMPORTANT
Rubber grommets may already be
mounted on cabling.
Follow instructions under Important
Regulatory and Installation
Requirements.
1. Feed the power supply cord with
3-prong molded plug through rear
top panel wiring gate of the boiler.
2. Slide cable into the strain relief and
secure with strain relief set screw.
3. Plug power supply cord into
receptacle. Ensure receptacle is
designated for the heating system
only.
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vitotronic 100

Table of Contents