C
Thermostat connected with correct cable, to specified connection
in IntrCooll®?
D
If Oxyconnect gateway is ordered, are necessary preparations
done?
E
If Building Management System will control the unit, is contractor
informed to take care of installation?
F
IntrCooll® used as AHU pre-cooling, is unit connected to specified
instructions?
Remarks:
6
Water Supply requirements
A
Local water quality according to specification?
B
Measured and noted the conductivity of the water on the site?
C
Water Supply according to specifications?
D
Shut- off valve provided and installed by contractor?
E
Maintenance water connection/valve provided and installed by
contractor?
F
Prepare piping for drain and overflow connection.
G
Drain valve installed according instructions?
Remarks:
Version 1.3, 2021-12-14
Thermostat control on page 37
o
o
Oxyconnect gateway
o
o
control on page 38
Control by a Building
o
o
Management
System on page 39
Control by an air handling
o
o
unit on page 39
YES
NO
Supply water quality
o
o
requirements
Supply water quality
o
o
requirements
Supply connections
o
o
Valves on page 36
o
o
Valves on page 36
o
o
Drain connections on page 35
o
o
Overflow
connections on page 35
Step 4. Drain valve installation
o
o
Install the IntrCooll®
1
2
3
4
5
51
Need help?
Do you have a question about the IntrCooll Std. and is the answer not in the manual?