1
Delivery of the crate and transport to the installation site
A
Is there a place indoor where the crated equipment can be stored
temporarily?
B
Is there a fork-lift truck or any other lifting device available with
proper lifting gear/ropes according to manual?
Remarks:
2
Installation requirements
A
Minimum free space for 1 side of 600 mm?
B
Minimum free space for 3 or more sides of 1000 mm?
C
There are no obstacles (i.e exhaust vents/fans, sewer pipe vents)
near equipment.
D
If the unit is placed/elevated more than 1.5 m above roof/floor, a
service platform with minimum free space (see 2.A and 2.B) is
provided?
Remarks:
3
Equipment installation
A
Support frame(s) for IntrCooll®
(not applicable for optional Flashing Kit or Natural Ventilator
module)
B
Equipment will be placed level (to prevent water leakage in
ducting)
C
Watertight roof transit for ducting
D
Water tight roof transit for cabling/water pipes
E
Roof beam supports are calculated/constructed such that they can
hold weight of IntrCooll® in operation (wet)
F
Ducting diameter/dimensions according to specifications?
Version 1.3, 2021-12-14
YES
NO
Reference
Handling and storage
o
o
Transport
o
o
YES
NO
Space
o
o
Space
o
o
requirements on page 20
o
o
o
o
YES
NO
o
o
Roof transit for
o
o
Roof transit for
o
o
Roof transits for cabling /
o
o
plumbing on page 26
Roof beam
o
o
supports on page 24
o
o
Install the IntrCooll®
1
2
3
4
5
49