Download Print this page

Tyco DV-5A Red-E Cabinet Quick Start Manual page 2

Red-e cabinet integrated deluge fire protection package
Hide thumbs Also See for DV-5A Red-E Cabinet:

Advertisement

TFP1301
Page 2 of 8
DIM
Description
A
System Discharge
B
Supply Header
C
Drain Header
D
Header Left
E
Header Right
F
Riser Height
G
Connection Offset
H
Connection Offset
J
Connection Offset
K
Connection Offset
L
Connection Offset
M
Connection Offset
N
Cabinet Height
P
Cabinet Width
R
Cabinet Depth
Notes
1. All pipe connections are grooved
2. Supply and drain header connections made internal to cabinet
H
J
C
B
1 1/2 (DN40)
2 (DN50)
1 1/2 (DN40)
2 (DN50)
4 (DN100)
17.0 (432,0)
16.0 (406,0)
68.26 (1733,8)
68.4 (1737,36)
9.42 (239,3)
5.0 (127,0)
4.88 (124,0)
6.88 (174,8)
5.63 (143,0)
19.5 (495,3)
73.25 (1860,6)
38.15 (969,0)
23.73 (602,7)
R
L
G
K
INSTALLATION DIMENSIONS AND REFERENCE POINTS
Nominal Riser Size
Nominal Dimension
in. (mm)
1
3 (DN80)
4 (DN100)
3 (DN80)
4 (DN100)
2 (DN50)
68.44 (1738,4)
67.34 (1738,4)
P
A
N
D
FIGURE 1
6 (DN150)
8 (DN200)
6 (DN150)
8 (DN200)
8 (DN200)
24.75 (628,7)
26.75 (679,5)
67.9 (1724,7)
9.34 (237,2)
8.6 (218,4)
8.5 (215,9)
9.5 (241,3)
6.57 (166,9)
25.15 (638,8)
73.5 (1866,9)
48.15 (1223,0)
29.64 (752,9)
M
F
E

Advertisement

loading

This manual is also suitable for:

Olr12016acOlr25033acOlr40050acOlr43075acOlr615100ac2Olr915150ac2 ... Show all