Attaching The Front Brackets - IBM SAN128B-7 Installation, Service And User Manual

Storage networking
Table of Contents

Advertisement

2. Insert four 8-32 x 5/16-in. flathead screws through the vertically aligned holes in the bracket and then
into the holes on the side of the device. Use the upper and lower screw holes, leaving the center holes
empty.
3. Repeat step 1 and step 2 to attach the left front bracket to the left side of the device.
4. Tighten all the 8-32 x 5/16-in. screws to a torque of 15 in-lb (17 cm-kg).
Figure 22. Attaching the front brackets
1. The SAN128B-7 device
2. Front brackets, right and left
3. Screws, 8-32 x 5/16-in., flathead Phillips
Attaching the front brackets to the rack
Complete the following steps to install the device in the rack.
1. Position the device in the rack, as shown in Figure 23 on page 31, providing temporary support under
the device until the rack kit is fully secured to the rack.
2. Attach the right front bracket to the right rack upright using two 10-32 x 5/8-in. screws and two
retainer nuts. Use the upper and lower holes in the bracket.
3. Attach the left front bracket to the left rack upright using two 10-32 x 5/8-in. screws and two retainer
nuts. Use the upper and lower holes in the bracket.
4. Tighten all the 10-32 x 5/8-in. screws to a torque of 25 in-lb (29 cm-kg).
30 IBM Storage Networking SAN128B-7: SAN128B-7 Installation, Service, and User Guide

Advertisement

Table of Contents
loading

Table of Contents