Download Print this page

Toro After Groundsmaster 4500-D Operator's Manual page 10

Traction unit
Hide thumbs Also See for After Groundsmaster 4500-D:

Advertisement

Figure 18
1. Bolt (3/8 x 1 inch)
2. Left mount
2.
Torque the bolts and nuts to 37 to 45 N∙m (27
to 33 ft-lb).
Installing the Right Front Mount
1.
Remove the existing hardware and use the 4
bolts (3/8 x 1 inch) 2 flange nuts, and 2 locknuts
to secure the mount to the machine
Figure 19
1. Flange nut (3/8 inch)
2. Locknut
2.
Torque the bolts and nuts to 37 to 45 N∙m (27
to 33 ft-lb).
Installing the Left Rear Mount
1.
Use the new hardware to secure the left rear
mount to the frame
3. Flange nut (3/8 inch)
(Figure
3. Left mount
4. Bolt (3/8 x 1 inch)
(Figure
20).
g030713
1. Bolt (1/2 x 6 inches)
2. Left mount
3. Flange nut
2.
Torque the bolts (1/2 x 6 inches) and nuts to 91
to 113 N∙m (67 to 83 ft-lb).
19).
3.
Torque the bolts (1/2 x 1-1/4 inches) to 91 to 113
N∙m (67 to 83 ft-lb).
Installing the Right Rear Mount
1.
Use the new hardware to secure the right rear
mount to the frame
g030714
1. Bolt (1/2 x 6 inches)
2. Right mount
3. Bolt (1/2 x 1-1/4 inches)
2.
Torque the bolts (1/2 x 6 inches) and nuts to 91
to 113 N∙m (67 to 83 ft-lb).
3.
Torque the bolts (1/2 x 1-1/4 inches) to 91 to 113
N∙m (67 to 83 ft-lb).
10
Figure 20
4. Reinforcement plate
5. Bolt (1/2 x 1-1/4 inches)
(Figure
21).
Figure 21
4. Flange nut
5. Reinforcement plate
g030716
g030717

Advertisement

loading

This manual is also suitable for:

After groundsmaster 4700-dReelmaster 7000-d