Pid Pre-Charge Function - Mitsubishi Electric FR-A800 Series Instruction Manual

Hide thumbs Also See for FR-A800 Series:
Table of Contents

Advertisement

Pr.759 setting
indication
9999
%
0
1
K
2
C
3
F
4
PSI
5
MPa
6
kPa
7
Pa
8
bar
9
mbr
10
GPH
11
GPM
12
GPS
13
L/H
14
L/M
15
L/S
16
CFH
17
CFM
18
CFS
19
CMH
20
CMM

5.14.12 PID Pre-charge function

This function drives the motor at a certain speed before starting PID control. This function is useful for a pump with a long hose,
since PID control would start before the pump is filled with water, and proper control would not be performed without this
function,
Pr.
760
Pre-charge fault selection
A616
761
Pre-charge ending level
A617
762
Pre-charge ending time
A618
763
Pre-charge upper detection
A619
level
764
Pre-charge time limit
A620
765
Second pre-charge fault
A656
selection
766
Second pre-charge ending
A657
level
767
Second pre-charge ending
A658
time
768
Second pre-charge upper
A659
detection level
769
Second pre-charge time limit
A660
618
5. PARAMETERS
5.14 (A) Application parameters
Downloaded from
ManualsNet.com
Unit
Unit name
%
(No indication)
Kelvin
Degree Celsius
Degree Fahrenheit
Pound-force per Square Inch
Mega Pascal
Kilo Pascal
Pascal
Bar
Millibar
Gallon per Hour
Gallon per Minute
Gallon per Second
Liter per Hour
Liter per Minute
Liter per Second
Cubic Feet per Hour
Cubic Feet per Minute
Cubic Feet per Second
Cubic Meter per Hour
Cubic Meter per Minute
Initial
Name
value
0
0
1
0 to 100%
9999
9999
0 to 3600 s
9999
9999
0 to 100%
9999
9999
0 to 3600 s
9999
9999
0
0, 1
0 to 100%,
9999
9999
0 to 3600 s,
9999
9999
0 to 100%,
9999
9999
0 to 3600 s,
9999
9999
search engine
Pr.759 setting
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
Setting
range
Fault indication with output shutoff immediately after pre-charge fault
occurs.
Fault indication with deceleration stop after pre-charge fault occurs.
Set the measured amount to end the pre-charge operation.
Without pre-charge ending level
Set the time to end the pre-charge operation.
Without pre-charge ending time
Set the upper limit for the pre-charged amount. A pre-charge fault
occurs when the measured value exceeds the setting during pre-
charging.
Without Pre-charge upper detection level
Set the time limit for the pre-charged amount. A pre-charge fault occurs
when the pre-charge time exceeds the setting.
Without Pre-charge time limit
Refer to Pr.760.
Refer to Pr.761.
Refer to Pr.762.
Refer to Pr.763.
Refer to Pr.764.
Unit
Unit name
indication
CMS
Cubic Meter per Second
ftM
Feet per Minute
ftS
Feet per Second
m/M
Meter per Minute
m/S
Meter per Second
lbH
Pound per Hour
lbM
Pound per Minute
lbS
Pound per Second
iWC
Inch Water Column
iWG
Inch Water Gauge
fWG
Feet of Water Gauge
mWG
Meter of Water Gauge
iHg
Inches of Mercury
mHg
Millimeters of Mercury
kgH
Kilogram per Hour
kgM
Kilogram per Minute
kgS
Kilogram per Second
ppm
Pulse per Minute
pps
Pulse per Second
kW
Kilowatt
hp
Horse Power
Hz
Hertz
rpm
Revolution per Minute
Description
Set the second pre-charge function.
The second pre-charge function is
valid when the RT signal is ON.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents