Dozer or Skidder Operation
Step 1. The dozer or skidder is moved to an area where
a load will be connected. The operator moves the control
lever to the LINE-OUT position so that the wire rope can
be pulled from the winch drum.
Operating Techniques, Power Controls
Operating Techniques, Power Controls
Note: Black dots indicate the
position of the control levers.
C
Step 2. A load (logs) is connected to the wire rope.
The operator moves the control level to the BRAKE-ON
position.
C
31
Need help?
Do you have a question about the W8L and is the answer not in the manual?
Questions and answers