Checklist For Power Up; Power Up The Universal Gateway - Cisco AS5400 Quick Start Manual

Cisco systems universal gateway quick start guide
Table of Contents

Advertisement

Note
If you are installing a redundant power supply in the Cisco AS5350, you should attach appropriate sized spade terminals
to the stripped ends of the ground and input wires.
Install the safety grounds (green wire) into the terminal block ground connectors and tighten the locking screws. Ensure
Step 4
that no bare wire is exposed.
Note
For central office installations, we recommend using a copper 6 AWG green ground wire with one end connected to
reliable earth. The other end of the wire should be crimped onto the double-hole lug provided in the installation pack.
The lug should be secured to the mating holes on either side of the chassis with the two screws included in the accessory
pack.
Insert the 48 VDC Return wires into the terminal block positive connectors (+) and tighten the locking screws. Ensure
Step 5
that no bare wire is exposed.
Caution
Do not overtorque the terminal block contact screws. The recommended torque is 5.0 in.-lb (0.56 N-m).
Insert the -48 VDC wires into the terminal block negative connectors (-) and tighten the locking screws. Ensure that no
Step 6
bare wire is exposed.
Step 7
Make sure that the power supply wires are secured to cable strain-relief clamps with cable ties.
Warning
After wiring the DC power supply, remove the tape from the circuit breaker switch handle and reinstate power by
moving the handle of the circuit breaker to the ON position. To see translations of the warnings that appear in the
publication, refer to the Regulatory Compliance and Safety Information document that accompanied this device.
Step 8
Power up the universal gateway. The internal power supply fan should power on.
5

Power Up the Universal Gateway

The information in this document applies to the Cisco AS5350, Cisco AS5400, and Cisco AS5400HPX universal
Note
gateways.
Note
Unless specifically noted, all references to the Cisco AS5400 also apply to the Cisco AS5400HPX.

Checklist for Power Up

You are ready to power up the Cisco universal gateway if the following steps are completed:
• Chassis is securely mounted.
• Power and interface cables are connected.
• Your PC terminal emulation program is configured for 9600 baud, 8 data bits, 1 stop bit, and no parity.
• You have selected passwords for access control.
• You have determined the IP addresses for the Ethernet and serial interfaces.
30

Advertisement

Table of Contents
loading

This manual is also suitable for:

As5350

Table of Contents