Checklist For Power-On; Power-On Procedure; Powering On The Cisco Vg - Cisco VG224 - Analog Phone Gateway Quick Start Manual

Voice gateway
Hide thumbs Also See for VG224 - Analog Phone Gateway:
Table of Contents

Advertisement

Table 3
WAN and Voice Cable Selection
Port or Interface
Analog voice FXS
Figure 13
WAN and Voice Connections
Distribution panel
1
2
Network
demarcation
RJ-21 cable (through a patch panel) to
1
central office
7

Powering On the Cisco VG224

Do not use AC and DC power at the same time. If you do, the unit stops operating, and you must reboot it with
Caution
only a single power source.

Checklist for Power-On

You are ready to power on the Cisco VG224 if it meets these requirements:
• The chassis is securely mounted.
• Power and interface cables are connected.

Power-On Procedure

Perform this procedure to power on your Cisco VG224 and verify that it goes through its initialization and self-test. When this
is finished, the Cisco VG224 is ready to configure.
To power on the Cisco VG224, follow this procedure:
Power on your terminal or PC, and configure it for 9600 bps, 8 data bits, 1 stop bit, and no parity.
Step 1
Move the Cisco VG224 power switch to the ON position.
Step 2
14
Color or Type
Connected To
RJ-21
Distribution panel
VG 22 4- 24
FX S
RJ-45 cable (through a patch panel) to central
2
office
Cable
RJ-21-to-RJ-21 straight-through cable (not included)
Cisco VG224

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents