Supplies Needed; Tools Needed; Step By Step Installation; Connection Of The Sma Triaxial Cable Carrying Signal Input - VibroSystM PCS-200ESB Installation Manual

Measuring chains with lin-300 series signal conditioner
Table of Contents

Advertisement

4.1.1 Supplies needed

When protection box without optional power supply is used:
M12 extension cable, supplied either as a:
a) standard, molded connector M12 extension cable, or
b) kit for field-assembled M12 extension cable, including:
- 30 m [100 ft.] extension cable (VSM P/N: 6001-11502 [Belden
- M12 connector
When protection box with optional power supply is used:
30 m [100 ft.] extension cable (VSM P/N: 6001-11502 [Belden

4.1.2 Tools needed

fish-tape (to pull M12 extension cable inside the protective conduit)
wire-stripper
assorted miniature flat screwdriver

4.2 Step by step installation

4.2.1 Connection of the SMA triaxial cable carrying signal input

Figure 24 : Triaxial cable connected to a LIN-300 Series module
32
LIN-300 Series Modules_Installation - Rev.4
®
#9940])
®
#9940])
1. Insert the SMA male connector and engage
by turning clockwise.
Recommended SMA connection
torque: 1.7 Nm [15 in-lb]
2. Insert the tooth lock washer, the round lug,
the spring lock washer and the nut onto the
grounding bolt. Screw the nut firmly to ensure
the grounding connection.
Recommended grounding connec-
tion torque: 2.8 Nm [25 in-lb]
The ground lug must not come in
contact with neither SMA con-
nector nor M12 connector.
Copyright © VibroSystM Inc., 2010

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lin-300 seriesLin-304s-6i-0.3/4.3Lin-306s-6i-0.3/6.3

Table of Contents