VibroSystM PCS-200ESB Installation Manual page 25

Measuring chains with lin-300 series signal conditioner
Table of Contents

Advertisement

Figure 14 : Typical location for inner grounding wire
Figure 15 : Mounting the liquidtight connectors
Copyright © VibroSystM Inc., 2010
2. Drill a grounding hole inside the protection
box according to Figure 14 : "Typical
location for inner grounding wire".
To determine the location for the holes,
keep in mind the components on the
mounting panel. Make sure the compo-
nents will not get in the way of the
connectors once the mounting panel is
reinserted.
3. After visualizing the routing of all cables,
drill holes for the liquidtight connectors.
Refer to Figure 15 : "Mounting the
liquidtight connectors".
4. Install the connectors.
LIN-300 Protection Boxes_Installation - Rev. 0
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lin-300 seriesLin-304s-6i-0.3/4.3Lin-306s-6i-0.3/6.3

Table of Contents