Installation Of The Protection Box; Supplies Needed; Tools Needed - VibroSystM PCS-200ESB Installation Manual

Measuring chains with lin-300 series signal conditioner
Table of Contents

Advertisement

3.1.2 Installation of the Protection Box

Figure 3 : Protection Box -Installation kit

3.1.4 Tools needed

Drill bits 5mm (13/64'') and 8mm (5/16'')
Tap drill 1/4''-20
Hammer drill
Drill
Concrete drill bit 8mm (5/16'')
Anchor setting punch
Ratchet set
3/4'' conduit hole saw or knockout punch set for 3/4'' liquidtight fittings
18
LIN-300 Protection Boxes_Installation - Rev. 0
3.1.3

Supplies needed

(2) 3/4" flexible conduit liquid tight connectors
(4) bolts 1/4-20 x 5/8"
(4) concrete anchors
(4) bolts M6 - 1.00 x 16 mm
(4) spring lockwashers 1/4"
(4) flat washers 1/4"
(4) brackets
(4) spring lockwashers 10-32
(4) flat washers 10-32
(4) screws 10-32 x 1/2"
Copyright © VibroSystM Inc., 2010

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lin-300 seriesLin-304s-6i-0.3/4.3Lin-306s-6i-0.3/6.3

Table of Contents