Figure 16 : Mounting the liquidtight strain relief connectors

3.2.6 Fastening the protection box

Figure 17 : Mounting holes location
26
LIN-300 Protection Boxes_Installation - Rev. 0
When using conduit other than the 19mm
(3/4'')
conduit,
use
liquidtight strain relief connectors according
to the size of the cable.
5. Drill holes for the appropriate liquidtight
strain relief connectors. Refer to Figure
16 : "Mounting the liquidtight strain relief
connectors".
6. Install the connectors.
7. Reinsert the mounting panel.
Choose the location for installing the
protection box.
The protection box can be mounted on a
concrete wall or, whenever possible,
directly onto the structure of the stator or
machine casing.
Copyright © VibroSystM Inc., 2010
the
appropriate

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lin-300 seriesLin-304s-6i-0.3/4.3Lin-306s-6i-0.3/6.3

Table of Contents