Hq 2/G-H, Hg 2/C-H, Mounting Position Monitoring Kit - Bosch rexroth HQ 2/G-H Assembly Instructions Manual

Table of Contents

Advertisement

38/84
Assembly
Required accessories
• Position monitoring kit for
HQ 2/G-H and HQ 2/C-H
3 842 567 133
• Sensor
IEC/EN 60947-5-2-2004,
3 842 558 990
1.
Install the switching
element for HQ 2/G-H
and HQ 2/C-H.
2.
Install the retaining
section and the bracket
of the kit.
3.
Install the switch
bracket to the profile.
4.
Install the sensor
to stop. Insert the
switch into the switch
bracket and adjust the
switching distance.
5.
Set the switch brackets
along the slot to the
respective position of
the switching element
by moving the switch
bracket down. All 3 lift
positions can be
detected/set/selected.
Bosch Rexroth AG, MIT: HQ 2/G-H, BS 2/G-250, 3 842 564 989/2022-06

7.6.11 HQ 2/G-H, HG 2/C-H, mounting position monitoring kit

HQ 2/G-H,
HQ 2/C-H
5
Fig. 21:
HQ 2/G-H, HG 2/C-H, mounting
1
) Customer selectable
M8 x 14
1
1
)
position monitoring kit
1
2
3
1
2
3
3
SW5
3x
T30
M
=8,7 Nm
D
M
= 2,5 Nm
D
4
+0,5
1
mm
564 988-39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rexroth bs 2/g-250Rexroth hq 2/c-h

Table of Contents