Download Print this page

Operation Instructions - Blodgett SC-GH Series Installation Operation & Maintenance

High efficiency gas fired convection steamer

Advertisement

4.0 OPERATION INSTRUCTIONS

CAUTION: If you smell gas during the lighting procedure,
immediately shut off the gas supply until the leak has been
corrected.
LIGHTING
Do not attempt to operate this unit in the event of a power failure.
1. Ensure power, gas and water supply is on.
2. Turn power switch "ON".
3. Steam generator tanks will begin filling with water.
4. Once proper water level has been reached, the ignition light will come on and should
remain on.
5. Cooker is now ready for use.
Your steamer has been factory set, when "ON" to maintain water temperature during the
READY phase at approximately 205° Fahrenheit (97° Celsius) just below water boiling
point.
CAUTION: The appliance and its parts are hot. Use care when
operating, cleaning and servicing the appliance.
CAUTION: Live steam and accumulated hot water in the
compartment may be released when the door is opened.
CAUTION: An obstructed drain can cause personal injury or
property damage.
WARNING: In the event of main burner ignition failure, a 5 minute
purge period must be observed prior to re-establishing ignition
source.
12

Advertisement

loading

This manual is also suitable for:

Sc-7ghnatSc-10ghlpSc-16ghlpSc-16ghnatSc-10ghnat