Operation Instructions For Boilers With Standard Controls - Blodgett GCX-2-6 Installation & Operation Manual

Gas cabinet base convection steamer with direct steam kettle(s)
Table of Contents

Advertisement

INSTALLATION AND OPERATION MANUAL, GAS FIRED PRESSURELESS COOKER WITH
DIRECT STEAM KETTLES, MODELS GCX-2-6, GCX-2-10, GCX-2-6-6 AND GCX-2-6-10
2.0 OPERATION INSTRUCTIONS
WARNING: Do not force the gas control knob. Use only your hand
to turn the gas control knob. Never use any tool. If the gas control
knob will not operate by hand the gas control should be replaced by
a qualified service technician.
WARNING: Do not disassemble the gas control; it contains no
replaceable components. Attempted disassembly or repair may
damage the gas control.
WARNING: In the event of main burner ignition failure, a 5 minute
purge period must be observed prior to re-establishing ignition
source.
For CSD-1 equipped boilers, see section 3.0 Operation Instructions for CSD-1 Equipped Boiler.
BOILER CONTROLS (Inside Cabinet)
Gas steam generators are available with standard boiler controls or ASME CSD-1 complaint
controls. In addition to the ON/OFF power switch and indicator pilot light with standard controls,
the CSD-1 controls have in addition four more indicator pilot lights and a "Reset" switch. Follow
the appropriate instructions for each.
Main Power Switch
Pilot Light
Boiler Pressure Gauge
PART NUMBER 10122R1
-
ON fills the boiler tank and turns the boiler controls on. You
should allow 20 minutes to fill the tank and generate steam.
-
OFF shuts off the boiler controls and opens the automatic
blowdown valve, emptying the boiler tank and releasing water
and steam to the drain. This should be done at least once
daily to remove sediment, lime or scale.
-
Indicates main power is ON.
-
Should read 9 - 11 psi during operation, 0 psi during
shutdown.
13
2003-10-09

Advertisement

Table of Contents
loading

Table of Contents