GENERAL

The SN-3E and SN-5E steamers are single compartment
electric pressureless steam cookers with
an internal electric steam generator that maintains water
temperature at approximately 205EF.
SN-3E is rated 7.5 kW as standard; 10 kW is optional.
SN-5E is rated 12 kW as standard; 15 kW
is optional.
At high altitude locations a lower temperature is required
to achieve atmospheric steaming.
Contact your authorized service office to have the ther-
mostat adjusted if the steamer will be
operated at high altitudes.

UNPACKAKING

Immediately after unpacking the steamer, check for pos-
sible shipping damage. If the steamer is found to be dam-
aged, save the packaging material and contact the carrier
within 15 days of delivery.
Prior to installation, verify that the electrical service agrees
with the specifications on the machine data plate which is
located on the left side panel.

LOCATION

Allow space for plumbing and electrical connections.
Allow adequate access for operating and servicing the
steamer (36" at the front of the steamer and 15" above
the steamer).

LEGS (OPTIONAL)

If the optional 4" adjustable legs are used, remove the
four levelling feet on the bottom of the steamer.

FEET

Levelling Feet (standard) or 4" Adjustable Legs (Op-
tional)
Thread the four 2" levelling feet shipped in a bag inside
the steamer cabinet into the threaded holes on the bot-
tom corners of the steamer. Or, thread the four optional
4" adjustable legs into the threaded holes on the bottom
corners of the steamer.

LEVELLING

Using a spirit level or pan of water in the bottom of the
steamer, adjust the levelling feet or the feet on the ad-
justable legs to level the steamer front-to-back and side-
to-side. After the drain is connected, check for level by
pouring water onto the floor of the compartment. All water
should drain through the opening at the back of the com-
partment cavity.

ANCORING STEAMER (WITHOUT LEGS)

1. Place steamer in the desired location on the lev-
elled counter top and mark four corners. Remove the
steamer and drill ½" holes as indicated in Figure 1.
2. Apply a bead of RTV or other equivalent sealant
around bottom perimeter edge of the steamer. If an-
choring the steamer, this bottom seal is necessary to
meet NSF requirements.
3. Set steamer on counter and bolt down securely with
3/8 - 16 bolts (not supplied).

STACKING KIT

Follow instructions in the stacking kit when installing
stacked convection steamers.
3

Installation Instructions

Figure 2
INSTALLATION

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sn-5e

Table of Contents