Bill of Materials
5
Bill of Materials
Table 6
shows the parts list for the INA220_Test_Board.
No.
Quantity
1
1
2
2
3
2
4
1
5
1
6
0
7
1
8
1
9
3
10
5
JUMP3 cut to size
11
4
12
4
13
11
14
3
15
1
20
INA220 Evaluation Module
Table 6. INA220_Test_Board Parts List
Value
Ref Des
4.02k
R5
10k
R3, R4
0Ω
R1, R2
10μF
C3
0.1μF
C2
Optional/Not
C1
Installed
LED
D1
DSUB25M
J1
N/A
N/A
JMP1-JMP5
Standoff
None
Screw
None
Test point
N/A
2-pin connector
T1, T2, T3
3-pin connector
T4
Copyright © 2009–2016, Texas Instruments Incorporated
Description
Vendor
Resistor, 4.02k,
ROHM
603
Resistor, 10k, 603
Yageo Corporation
RES 0.0 OHM
Panasonic - ECG
1/8W 5% 0805
SMD
Capacitor,
Kemet
Tantalum, 10uF,
16V, 6032
CAP .10UF 25V
Kemet
CERAMIC Y5V
0603
0603-1206
—
Capacitor
Diode, LED, Ultra
Panasonic
Bright Diff, 603
CONN D-SUB
AMP/Tyco
PLUG R/A 25POS
Electronics
30GOLD (With
Threaded Inserts
and Board locks)
SHUNT LP
AMP/Tyco
W/HANDLE 2 POS
Electronics
30AU
CONN HEADER
Samtec
32POS .100" SGL
GOLD (4 per Strip)
Standoffs, Hex , 4-
Keystone
40 Threaded,
0.500" length,
0.250" OD,
Aluminum Iridite
Finish
SCREW MACHINE
Building Fasteners
PHIL 4-40X1/4 SS
5018 SMD Test
Keystone
Point
2-Position Terminal
On-Shore
Strip, Cage Clamp,
Technology Inc
45°, 15A, Dove-
tailed
3-Position Terminal
On-Shore
Strip, Cage Clamp,
Technology Inc
45°, 15A, Dove-
tailed
SBOU079B – July 2009 – Revised May 2016
www.ti.com
Part Number
MCR03EZPFX4021
RC0603FR-0710KL
ERJ-6GEY0R00V
T491C106M016AT
C0603C104M3VACTU
—
LNJ208R8ARA
5747842-4
881545-2
TSW-132-07-G-S
2203
PMSSS 440 0025 PH
5018
ED300/2
ED300/3
Submit Documentation Feedback