Contents ........................Overview ......................Purpose .................... EVM Basic Functions .................... Power Requirements ..............ADS5231/32 EVM Operational Procedure ...................... Circuit Description ....................Schematic Diagram ....................Circuit Function ..................EVM Use With the TSW1100 ..................Connecting to the TSW1100 ..............Provide Power to the ADS5231/32 EVM ................
Page 4
List of Figures ........................Top Layer ....................Layer 2, Ground Plane ....................Layer 3, Power Plane #1 ....................Layer 4, Power Plane #2 ....................Layer 5, Ground Plane ..................... Layer 6, Bottom Layer List of Tables ...................... Three-Pin Jumper List ....................
User's Guide SBAU111A – May 2006 – Revised June 2007 ADS5231/32 EVM This preliminary user’s guide gives a general overview of the ADS5231/32 evaluation module (EVM), and provides a general description of the features and functions to be considered while using this module. Overview Purpose The ADS5231/32 EVM provides a platform for evaluating the ADS5231/32 dual, 12-bit, analog-to-digital...
www.ti.com Circuit Description 3. Switch power supplies on 4. Use a function generator with 50-Ω output to input a 45-MHz, 1.5-V offset, 3-V square-wave signal into J3. The frequency of the clock must be within the specification for the device speed grade. Caution: the ADS5231/32 does not work with a sinusoidal clock source.
Page 7
2.2.5 Outputs The data outputs from the ADC are buffered using two Texas Instruments SN74AVC16244s. Output data headers J8 and J21 are standard 40-pin headers on a 100-mil grid, and allow easy connection to a logic analyzer or TSW1100. The connector pinout is listed in Table 2.
Use either a wall-mount transformer that has an output rating of 12 VDC and 500 mA or a lab power supply that can supply 12 VDC. Connect the output to J8 and the return to J9. Texas Instruments recommends setting a current limit of 500 mA. Power on the TSW1100.
Launching the TSW1100 Software With the TSW1100 recognized by the hardware device manager, the software package can be run. To run the program, click on Start → Program Files → Texas Instruments → TI ADC Capture Card. Using the TSW1100 Software Using the TI chip selector, select the ADS5231/32.
www.ti.com Physical Description PCB Layout The EVM is constructed on a 6-layer, 5.15-inch × 5.05-inch, 0.062-inch thick PCB using FR-4 material. The individual layers are shown in Figure 1 through Figure Figure 1. Top Layer ADS5231/32 EVM SBAU111A – May 2006 – Revised June 2007 Submit Documentation Feedback...
www.ti.com Parts List and Schematics Parts List and Schematics Table 4 lists the parts used in constructing the EVM. The EVM schematics are appended at the end of this section. Table 4. ADS5231/32 EVM Parts List Value Part Number Vendor Ref Des Installed CAPACITORS...
Page 17
www.ti.com Parts List and Schematics Table 4. ADS5231/32 EVM Parts List (continued) Value Part Number Vendor Ref Des Installed ADS5231 or ADS5232 ADS5231 or ADS5232 THS4503 THS4503ID U2 U9 OPA2227UA OPA2227UA TPS79225 TPS79225 SN74AVC16244 SN74AVC16244DGG TI U7 U10 Screw, machine, PH 4-40 × 3/8 PMS 440 0038 PH Building Fasteners...
Page 24
Parts List and Schematics EVALUATION BOARD/KIT IMPORTANT NOTICE Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use.
Page 25
Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright 2006, Texas Instruments Incorporated EVM WARNINGS AND RESTRICTIONS It is important to operate this EVM within the AVDD voltage range of –0.3 V to 3.8 V and the...
Page 26
TI as compliant with ISO/TS 16949 requirements. Buyers acknowledge and agree that, if they use any non-designated products in automotive applications, TI will not be responsible for any failure to meet such requirements. Following are URLs where you can obtain information on other Texas Instruments products and application solutions: Products...
Need help?
Do you have a question about the ADS5231 EVM and is the answer not in the manual?
Questions and answers