eneral conditions
The device is intended to be installed in a suitable plant for its use and its purpose. All the
installation instruction described in this chapter must be followed considering the plant
structure where the device is intended to be installed. Its performance therefore depends on
the correctness of the installation.
Staff authorised to carry out the installation must be specialised and experienced in this job.
They must also have received suitable training on equipment of this type.
The installation must be performed by qualified installers and/or licensed electricians in ac-
cordance with the existing regulations in the country of installation.
The removal of the inverter panels/covers allows access to the area dedicated to service
personnel (the operator is not authorized to access this area)
Connection of the photovoltaic system to an electric installation connected to the distribution
grid must be approved by the electricity provider.
The installation must be carried out with the equipment disconnected from any voltage
sources. Refer to "Inverter switch-off" chapter on this manual to know all the necessary step
to safely operate on the inverter.
When the photovoltaic panels are exposed to sunlight they provide continuous DC voltage
to the inverter.
Installation
The installation operations must be carried out by qualified personnel
and it is mandatory to adhere to the indications provided in this manual,
the diagrams and the enclosed documentation, paying attention to follow
the installation sequence exactly as described in this manual.