Setting Up A Call - HP 8924E Introduction Manual

Mobile station test set
Hide thumbs Also See for 8924E:
Table of Contents

Advertisement

Setting up a Call

1. Preset the Test Set.
1. If the Test Set is not powered on:
a. turn on power to the PCS Interface (if one is
present), then...
b.turn on power to the Test Set. Wait for the Test
Set to complete its power-up routine
2. Press the PRESET key (to begin this procedure
in a known state).
Pressing the PRESET key will configure the Test Set using factory default settings, and display the CDMA
CALL CONTROL screen.
If you have the Test Set configured to operate with a PCS Interface, and you do not turn PCS Interface
power on before the Test Set, the message "PCS Interface not found. Check power, cabling or CONFIG."
will be displayed. To correct this condition, follow the correct sequence of powering up these two units.
Chapter 2, Set Up a Call
CDMA CALL CONTROL
Call Status
MS FER Report
Transmitting
Page Sent
Access Probe
Avg Power
Connected
Softer Handoff
Hard Handoff
MS ID
RF Channel
MS FER
Traffic
384
Report
Data Mode
Phone Num
5099214001
Interval
Svc Opt 1
Register
5 frames
Data Type
Softer
by # frames
Echo
MS Database
Handoff
On/Off
ESN
Echo Delay
Begin/End
1234
Short
by # frames
Answer Mode
On/Off
Sector A
Auto/Manual
Avg Power
5
Power
Call Limit
Power Zero
-73.0
None/Page
Setting up a Call
%
dBm
----
To Screen
CDMA
CALL CNTL
Analog
RX TEST
Cnfig
PRNT CNFG
dBm/BW
43

Advertisement

Table of Contents
loading

Table of Contents