Installation Complete - Supero SC812L Series User Manual

Hide thumbs Also See for SC812L Series:
Table of Contents

Advertisement

Chapter 4: Chassis Setup and Maintenance
4-8

Installation Complete

In most cases, the chassis power supply and blowers are pre-installed. If you need
to install blowers continue to the Systems Blower section of this chapter. If the
chassis will be installed into a rack, continue to the next chapter for rack installa-
tion instructions.
4-11

Advertisement

Table of Contents
loading

Table of Contents