Materials Required For Assembly; Parts List; Tools And Aids; Screws - privileg SY-103E9G-P1-C13-L22-600 User Manual

Wall-mounted headroom hood
Hide thumbs Also See for SY-103E9G-P1-C13-L22-600:
Table of Contents

Advertisement

Available languages

Available languages

Page GB-10

Materials required for assembly

Materials required for assembly

Parts list

(1) Exhaust hood
(2) upper part of the flue screen
(3) lower part of the flue screen
(4) Exhaust air operation: Exhaust air hose
(5) Exhaust air operation: Check valve
(6) Wall bracket for upper flue screen
(7) Retaining plate for lower flue screen
(8) 6 plate screws 4.0 × 8 mm
(9) Cable ties

Tools and aids

You will need:
– Screwdriver
– Drill with stone bit, correctly sized for
the (10), (11) and (12) screws.
(1)
– Measuring tape / ruler
– Level
– Pencil
– Stable stepladder
(2)
– Work gloves
We also recommend having a second person
(3)
with you to help.

Screws

(4)
The screws and dowels required to
mount the appliance on a wall are not
(5)
included in the package contents as
their type and dimensions will vary depend-
ing on the characteristics of the wall.
(6)
Please have a specialist advise you as to
(7)
which ones you need.
(8)
(9)
In total, you will need
– 2 round-head screws (10) to attach
the wall bracket(6) for the upper flue
screen (2)
– 2 round-head screws (11) to hang the
Exhaust hood, maximum ø 6 mm
– 2 round-head screws (12) with flat wash-
ers to secure the Exhaust hood, maxi-
mum ø 6 mm
– 6 suitable wall plugs
(10)
(11)
(12)

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

32574861

Table of Contents