Havis DS-PAN-1010 Series Owner's Manual page 8

Hide thumbs Also See for DS-PAN-1010 Series:
Table of Contents

Advertisement

Installation & Cable Management (continued)
4) Lower the Docking Station to the Mounting Bracket as shown and secure with (4) 1/4" -20 x 3/8"
long screws (Hardware Kit Item 4). Ensure cable bundle remains in Cable Channel before securing.
Torque screws to 80-in (9.0 Nm) ± 10%.
5) Secure cable bundle to the Mounting Bracket with a supplied Zip Tie.
6) Create a service loop with cable bundle to ensure that no tension is on the connectors and to enable
intended range of motion.
7) Tie off cables onto a stationary part of the mounting system.
(Mounting system not included with Docking Station)
5
6
This loop must be large enough to allow
full range of expected rotation and
extension without stressing connections.
7
Collect cables to secure to the
mounting system.
(Note: mounting system not included)
1/4" – 20 x /8" Screws

Advertisement

Table of Contents
loading

Table of Contents