Installation - SHOWTEC NET-2 3-pin Manual

Table of Contents

Advertisement

Net-2 Panel, 3-pin

Installation

Remove all packing materials from the Net-2 Panel. Check that all foam and plastic padding is removed.
The Net-2 Panel can be powered from the Ethernet connection, using Power-over-Ethernet (PoE)
technology. If the network switch does not support PoE, you can use a PoE injector or the 12–36 V DC
connector.
Do not supply power before the whole system is set up and connected properly.
Always disconnect from electric mains power supply before cleaning or servicing.
Damages caused by non-observance are not subject to warranty.
01) Place the mounting plate on a U50 wall box and tighten the screws.
02) Install the Net-2 Panel on the mounting plate by clicking it into place, starting with the top of the
device.
Order code: 50812/50814
7
Fig. 03
Fig. 04

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the NET-2 3-pin and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

5081250814

Table of Contents