NewAir NKR058MB00 Owner's Manual page 17

Table of Contents

Advertisement

Available languages

Available languages

Beer and Gas Lines Installation
Gas Line to Regulator Installation
1. Attach one end of the gas line (blue) hose to the connection on the CO2
regulator.
2. Secure the line by tightening the steel hose clamp already attached to the
line. Use Pliers/screwdriver to tighten clamp and be sure to check for leaks
in this area once the CO2 is flowing out of the cylinder.
3. Remove one of the two plugs on the back of the cabinet by twisting and
pulling it out. (Note: Save it if you decide to place your CO2 cylinder inside
the cabinet.)
4. Feed the other end of the gas line through the opening and attach it to the
coupler (see next steps).
www.newair.com
EN
17

Advertisement

Table of Contents
loading

Table of Contents