Hunter HVLS Installation Manual page 21

Table of Contents

Advertisement

INSTALLATION
F
Feed guy wires through disc to hold in place
during turnbuckle installation. Pull excess
cable until guy wire is taut. Place level against
the downrod and tighten the turnbuckles
by hand in a crisscross pattern, periodically
checking to ensure the downrod is plumb and
the fan is level.
F
STEP 5: GUY WIRES
• Attach guy wire to building structure while maintaining a 45° angle between
the ceiling and the guy wire.
• Do not wrap guy wires around the building structure. The guys wires could fray
if in contact with the building structure.
G & H
Tighten bolts on
Gripples, and
then tighten the
set screws on
the turnbuckles.
H
TITAN & ECO ONLY
TURNBUCKLE
SET SCREW
G
2.5mm
Allen
21

Advertisement

Table of Contents
loading

Table of Contents