Step 4: Vfd Control Panel - Hunter HVLS Installation Manual

Table of Contents

Advertisement

INSTALLATION
A
The VFD control panel
should be mounted directly
above the fan and downrod.
B
D
NOTE
USE COMM 2 FOR MULITIFAN INSTALL
STEP 4: VARIABLE FREQUENCY DRIVE (VFD)
CONTROL PANEL
B
Position the VFD control
panel with plug connectors
facing down.
If using uni-strut attached to
the building structure, secure
industrial control panel with
four 1/4"-20 fasteners, one in
each corner of the panel.
C
CAUTION: DO NOT ENERGIZE CIRCUIT UNTIL
MECHANICAL INSTALLATION IS COMPLETE
NOTE
Align male connector with female receptacle. Do
not force connector into receptacle.
C
Connect the VFD cable from
fan to the industrial control
panel. Orient the cable to
the connection so it engages
slightly. Twist to lock in
place. Secure excess cable to
mounting location.
D
Connect the communication
cable (Cat 5) to one of the
COMM terminals and run
cable down to the control
location.
NOTE
Twist Lock will act as a
disconnect.
19

Advertisement

Table of Contents
loading

Table of Contents