Power Meter - Delta H9E Operation And Installation Manual

Grid-tie transformerless hybrid inverter
Table of Contents

Advertisement

6.4 Power meter

Connecting the current sensor in the following steps:
1. Attach a current sensor to the L cables of the main earth leakage circuit breaker,
Clamp the current sensor and make sure that the direction is correct.
2. Connect one end of the current sensor cable to the current sensor connection
terminal and the other end to the Meter terminal in the junction box of inverter.
Battery
COMM. module
Figure 6-2 : Digital input on COMM. module
Figure 6-3 : Power meter
METER
(Step2)
29
Active/Reactive Power Control
N
L
(Step1)
(Step2)
local load

Advertisement

Table of Contents
loading

This manual is also suitable for:

H8eH10e

Table of Contents