[F] Freeze Completion Control - Hoshizaki DIM-40DE-HC Service Manual

Cube ice dispenser
Hide thumbs Also See for DIM-40DE-HC:
Table of Contents

Advertisement

[f] FREEZE COMPLETION CONTROL

1) The target integrated values (cube control thermistor temperature and freeze cycle
time) are set for freeze completion.
* The target integrated freeze completion temperature and time are adjustable in the
maintenance mode (see "3. [b] MAINTENANCE MODE").
2) After the cube control thermistor senses a temperature below 0°C, the cube control
thermistor temperature and freeze cycle time are integrated every second.
3) When the integrated values reach the target, the freeze cycle completes.
Cube control
thermistor temp
0°C
As the previous freeze completion control depended on the freeze completion
temperature only, the dimple size varied in 1) spring/fall, 2) summer, and 3) winter even
at the same freeze completion temperature.
For example, when the freeze completion temperature is -18°C and the dimple size is
5 mm, the freeze cycle time becomes longer and dimple size smaller in summer, and
the freeze cycle time becomes shorter and dimple size larger in winter.
Time: 12 min
Integration
Integration begins
when ice starts to form
11
Freeze cycle time (min)
Temperature: -18°C

Advertisement

Table of Contents
loading

This manual is also suitable for:

L024

Table of Contents