5.
Here we explain the flow from startup until operation begins. Proceed with the flow shown in the illustration
below, and consult the appropriate manuals as necessary for each step.
Connection
Communication
Trial operation
5
10
Flow until operation begins
Work steps
• Connect connectors and cables
and
cabling
Controller
• No setting items
settings
Host control device
• Register the network settings file (ESI)
• Set the communication parameters
• Begin cyclic communication
• Check remote I/O and remote command input/output
• Debug the program
Start operation
Operation
Refer to:
6.1 Network structure
6.2 Cabling
6.3 Noise countermeasures
8
Parameter settings
RCX340 User's Manual
Remote I/O Manual
RCX340 User's Manual
Remote I/O Manual