STEP 4
1)
Cut and
dry-fit
the pipe and
diameter discharge pipe (may be reduced to
if local code allows it.)
2)
While
dry-fitting
the discharge pipe, position and mark the location of
the pump unit discharge
fitting.
3)
Cut and
dry-fit
DN40 (1-1/2") vent pipe as required to ensure that
the
vent
pipe does not interfere with other components. Make the
connection to the pump unit with the provided street elbow.
A 2" x 1" 90° discharge
may be easier to pipe straight up depending on the installation.
Proper venting is required.
4)
Temporarily set the toilet in place to check that there is no piping
interference. Remove the toilet and set it aside.
5)
Clean, prime and solvent weld the discharge piping and pump unit
discharge
384 mm
(15-1/8")
DN25
fittings
as required for
DN20
[3/4"]
diameter
fitting
has been provided. However, it
© Copyright 2022 Zoeller
PIPING
(1")
When applying solvent weld to discharge
none gets into the check valve assembly. Pay close attention to the proper
alignment of the discharge
6)
For markets requiring a pipe vent, clean and solvent weld the vent piping
as required for proper venting.
7)
Optional carbon filter vent:
For markets where a carbon filter vent is allowed, please replace the
carbon filter periodically to keep ventilation functioning properly.
Note: Adding other bathroom
to accept additional bathroom
Available for connecting DN25 (1") pipe. Simply reverse the pipe adaptor
and cut out the molded-in plug at the provided indentation.
Cut cleanly and remove burrs and rough edges to avoid
the potential for clogging.
Co. All rights reserved.
®
- 7 -
previously marked.
fixtures
- The Qwik Jon
®
Premier is designed
fixtures
utilizing the two side inlets.
Ø89 mm
(Ø3-1/2")
178 mm
(7")
38 mm
(1-1/2")
ensure that

Advertisement