Zoeller QWIK JON PREMIER 201 Installation Instructions Manual page 6

Hide thumbs Also See for QWIK JON PREMIER 201:
Table of Contents

Advertisement

STEP 3
(STAND-ALONE INSTALLATION)
1)
Position the pump unit a minimum of 3 mm (1/8") from the wall
with the inlet facing away from the wall. Attach the bellows to the
inlet using the worm drive clamp provided.
2)
Place the toilet in front of pump unit aligning the discharge of the
toilet with the inlet of the pump unit. Make sure that the bellows
will bridge the gap adequately for
tank should be a minimum of 13 mm (1/2") from the wall.
3)
Lightly mark the locations of the pump unit, toilet and closet
bolt locations on the
of the pump unit and the bottom and sides of the toilet tank to
ensure against interference from pipe runs later.
4)
Remove the toilet from the pump unit and set it aside.
Connect the rear discharge toilet to the front inlet of the Qwik Jon Premier via hose clamps. Ensure the connec�ons are
according to local, regional, and state codes.
ROUGH-IN
installation. The toilet
Lightly mark the wall with the height
© Copyright 2022 Zoeller
(BEHIND THE WALL INSTALLATION)
1)
Installing the pump unit behind a wall will require an
extension kit (P/N 10-3050) sold separately.
2)
Place the toilet assembly a minimum of 13 mm ( 1/2" ) from
the wall and mark the closet bolt locations on the floor.
3)
Measure the appropriate length of 89mm (3-1/2")
Schedule 40 PVC pipe provided with the extension kit
and cut it to length. See sketch below.
4)
Set toilet aside.
precautions to ensure that toilet does not tip over and break.
®
*These drawings are for reference only.
Exact components may differ by region.
Co. All rights reserved.
®
- 6 -
Toilet assembly is top heavy. Take special

Advertisement

Table of Contents
loading

Table of Contents