H3C S12500X-AF Series Installation Manual page 124

Hide thumbs Also See for S12500X-AF Series:
Table of Contents

Advertisement

9
Appendix B Cabling recommendations
Routing cables
The cable management brackets are installed on the two sides of the LPU section. As a best practice,
route cables from the left and right sides of the switch, as shown in Figure9-1.
Figure9-1 Routing cables (S12516X-AF switch)
9-1

Advertisement

Table of Contents
loading

Table of Contents