v Check that the cabinets are arranged properly and adjust if needed. Refer to the
DANGER
Take the following steps to finish placing the cabinets:
__ 1. Inspect the cabinets, components, and cable connections for shipping
__ 2. Install the cabinet stabilizer on each cabinet as required.
Figure 4. Frame stabilizer (tilt) foot installation
16
Installation and Service
packing slip and the cabinet labels to verify that all cabinets are in their proper
location.
Ensure that all rack-mounted units are fastened in the rack frame. Do not
extend or exchange any rack-mounted units when the stabilizer is not
installed.
damage.
v Refer to Figure 4 for stabilizer kit installation
Front tilt foot