Panel Preparation-Close Mount (Kit 2 - 4 Conduit) - Trane AFDR Installation Instructions Manual

Table of Contents

Advertisement

Panel Preparation—Close Mount (Kit 2 — 4 conduit)
Refer to
Figure 37
during the following procedure.
2. Drill four 2.5-inch diameter holes at Locations 1–4, as
shown in
Figure
37. These holes will be used to route
the power wire which connects the unit to the AFD.
Notes:
Test-fit the 2.5-inch conduit fittings at the locations to
ensure the conduit and or fitting will not interfere with
the unit evaporator and or panel before drilling holes.
Figure 37. Power conduit hole locations
1
2
Note: See
"Dimensions," p. 9
dimensions.
AFDR-SVN001D-EN
2-4X Holes Drilled
2-4X Ø 2.5
Panel Bottom
3
4
for conduit location
Depending on the unit's evaporator size the holes may
be located further inward than specified without
interference between conduit and evaporator.
Locating the holes further inward will aid in harness
installation later. Before drilling, make sure conduit
and fittings will not interfere with evaporator or panel
door.
Panel Front
Installation
37

Advertisement

Table of Contents
loading

Table of Contents